Pad Site Expansion Project, Electrical Utility Company In Houston, Texas
IKON recently completed the expansion of a 4-acre pad site consisting of 4,000 CY of embankment, 8,200 SY of lime stabilization of subgrade and 8,200 SY of 6” paving with 5% cement stabilized crushed limestone base. The project also involved the construction of a 17’ deep concrete lined stormwater detention pond consisting of 12,000 SF of 6” thick concrete side slopes.
The project also included the installation of 1,100 linear feet of storm sewer pipe and drainage inlets.